TSMC is quietly sizing up a second major US site, and the paperwork puts it within striking distance of Elon Musk's own chip ambitions.
A publicly viewable application under Texas's Jobs, Energy, Technology and Innovation (JETI) Act shows the Taiwanese contract manufacturer is evaluating a location near College Station, about 120 kilometers northwest of Houston, for what it calls the "TSMC Texas Advanced Semiconductor Manufacturing Campus."
According to the filing, construction would run from 2027 to 2032 and cost roughly $22.6 billion.
A 30-kilometer neighbor to Terafab
The parcel TSMC has in mind sits only about 30 kilometers in a straight line from the site SpaceXSI has chosen for "Terafab," the enormous chip plant Musk has announced. The company — formed from the merger of SpaceX and xAI under the name SpaceXAI — has said it wants to invest up to $119 billion in the project, and Musk has so far named Intel primarily as its technology partner.
If the new fab is running by 2032, the filing indicates it would produce chips at N2 and newer process nodes. TSMC names AI accelerators as a target application.
Arizona still on the table
TSMC already operates a plant in Arizona and is expanding there. The JETI application makes clear the company is weighing other US locations too, with Arizona prominent among them. Tax incentives are described as an important site-selection factor, alongside land, power, water, gas and available labor.
The company's US footprint matters widely: TSMC fabricates for Nvidia, AMD and Intel, produces AI chips and ARM server processors for Google, Amazon AWS and Microsoft, and makes network processors for Broadcom, Cisco, HPE, Juniper and Marvell.
The application is a proposal rather than a commitment, and TSMC has continued to evaluate competing sites. But the numbers are unusually concrete for a plan that has so far been discussed mostly in the abstract.



